700
TOTAL WORKS
700
AS ACCORDED
700
TS ACCORDED
700
TENDERED
600
AWARDED
100
COMPLETED
100
EXPENDITURE(Cr.)

Shri. Pinarayi Vijayan

Hon'ble Chief Minister

Shri. M B Rajesh

Hon'ble Minister for LSGD

Dr. Venu V IAS

Chief Secretary (Chairman, SHPSC, AMRUT)

Smt. Sarada Muraleedharan IAS

Addl. Chief Secretary (Chairman, SLTC)

Shri. M.G.Rajamanickam IAS

Mission Director, AMRUT

ATAL MISSION FOR REJUVENATION & URBAN TRANSFORMATION

The Prime Minister of India launched AMRUT on 25th June 2015

AMRUT KERALA launched  on 1st September 2015

Total number of projects: 1022

Total Outlay of the projects: 2357.69 Crore

Fund Sharing Pattern: Central Assistance – 50%, State – 30%, ULB – 20%

  • Water supply system, Augmentation of existing water supply, Water treatment plants, Universal metering.
  • Rehabilitation of old water supply systems and treatment plants.
  • Rejuvenation of water bodies and recharging of ground water.
  • Special water supply arrangement for difficult areas, hill and coastal cities and those having water quality problems (e.g. arsenic, fluoride).
  • Decentralised, networked underground sewerage systems, including augmentation of existing sewerage systems and sewage treatment plants. 
  • Rehabilitation of old sewerage system and treatment plants.
  • Recycling of water for beneficial purposes and reuse of wastewater. 

Construction and improvement of drains and storm water drains in order to reduce and eliminate flooding.

  • Construction & improvement of Footpaths/ Walkways, Sidewalks, Foot Over Bridges and facilities for non-motorised transport (e.g. bicycles).
  • Multi-level parking.

Development of green space and parks with special provision for children, senior citizens and Divyang friendly components.

  • Improving delivery of citizen services
  • Bringing down the cost of delivery
  • Improving financial health of Urban Local Bodies
  • Augmenting resources
  • Enhancing transparency.
  • Improving institutional outcomes by Individual Capacity Building and Institutional Capacity Building. 
  • Enhancing the functional knowledge
  • Improving the job related skills
  • Changing the attitude of municipal functionaries.

9 AMRUT MISSION CITIES

6 CORPORATIONS

Thiruvananthapuram, Kollam, Kochi, Thrissur, Kozhikode & Kannur

3 MUNICIPALITIES

Alappuzha, Guruvayur & Palakkad

WATER SUPPLY

  • 6 Water Treatment Plants (Capacity: 265 MLD)
  • 20 Water Tanks (Capacity: 135 Lakh Litre)
  • 1462 Kilometer Water Supply Network
  • 36149 water tap connections 
  • 155 out of 217 Projects completed
  • Expenditure: 1192.35 Cr. (81.56%)

SEWERAGE & SEPTAGE MANAGEMENT

  • 9 Sewage Treatment Plants (Capacity: 27.70 MLD)
  • 5 Septage Treatment Plants (Capacity: 320 KLD)
  • 100 out of 152 Projects completed
  • Expenditure: 243.18 Cr. (69.16%)

STORM WATER DRAINAGE

  • 389 Km. Stormwater drainage network
  • 1093 out of 1304 water logging points eliminated
  • 493 out of 536 Projects completed
  • Expenditure: 285.04 Cr. (84.62%)

URBAN TRANSPORT

  • 75.58 Kilometer Footpath
  • 17 Foot Over Bridges
  • 1 Skywalk
  • 1 Subway
  • 7 Multi-level parking
  • 105 out of 128 Projects completed
  • Expenditure: 125.11 Cr. (65.99%)

GREEN SPACE & PARKS

  •  Total Area:33 Acre  (23 Acre covered)
  • 72 out of 78 Projects completed
  • Expenditure: 37.91Cr. (82.10%)

REFORMS IMPLEMENTATION

  • Reforms Incentives received : Rs. 59.82 Crore (7th Rank with average score of 82.49% for Kerala)
  • Street Light Replaced as part of Energy efficiency: 1.84 lakh
  • Energy auditing done& 31 Pumps replaced
  • Credit Rating :  Completed for 9 cities & 2 Cities are eligible for issuance of bond (TVM & KOCHI)
  • Formulation of GIS based Master Plan : Master Plan for 9 Mission cities has been published for suggestions and objections
  • Local Area Plan & Town Planning Scheme (LAP&TPS) : Preparation progressing  in Thiruvananthapuram City
  • Single Window Clearance System for Building Plan approval: State Reforms under AMRUT. Adopted by the State

CAPACITY BUILDING

  • Total Functionaries Trained : 3722 Nos (Including Officials & Elected representatives)
    • Orientation: 1202 Nos
    • Training: 1101 Nos
    • Training cum workshop: 1092 Nos
    • Online training: 327 Nos
  • Exposure visit done: 402 ULB functionaries

© All rights reserved. This website is developed and managed by the State Mission Management Unit, AMRUT